Navigation:
»No topics above this level«To Set the Date that the Job will Next Run:
i.In the Next Run time: field, click on the down arrow to the right of the displayed date and time.
ii.Select the required date from the displayed calendar. See Figure 1500 below:
Figure 1500
To Set the Time that a Job will Run:
i.In the Next Run time: field, click on the displayed hours or minutes.
ii.Enter the required value. See Figure 1501 below:
Figure 1501
To Create an Archive Job:
Select the Is Archive checkbox.
Interval Checkbox:
i.If the Job is only required to run once, deselect the Interval checkbox;
Otherwise -
ii.Enter the required Days, Weeks or Months into the associated boxes.
Overwrite Files Checkbox:
If a recurring Backup Job should overwrite its own previous Backup files, select the Overwrite Files checkbox.
To set the Archive Overlap period on an Archive Job:
i.Select the Overlap checkbox.
ii.Enter the required Days, Weeks or Months into the associated box.